• archives •

Train Time Table 12th October to 3rd January 2004

Listing Category
Item Description

Train Time Table 12th October to 3rd January 2004

Item Detail
Arriva Trains Northern A6 Leeds to Carlisle and Morcambe Timetable engineering work will be taking place between Settle and Appleby on week days between Monday 29th September and Friday 10th October inclusive A revised timetable will be available showing trains and bus replacement services during the period 28th September to 11th October
Year/Date Produced or dateable to
2003
S&C ArchNumber
SCHARCH10417-28
Approx Dimensions
21cm x 10cm
Box Code
SCHARCH 48 TIMETABLES
Medium
Paper

read about some of our other projects

An essential Guide to ensure the spirit of the Settle Carlisle Line lives on. The whole of the line was designated as a Conservation Area...

We have created a ‘Railway Room’ at the Museum telling the story of the Settle-Carlisle line and the people who worked on it. In 2019...